Brutal Endeavors Press Whitemare Media

Divert the River

The Engineering and Human Cost of Hoover Dam (1931–1936)

Meet the high-scalers on the canyon wall, see the rig that helped drive the diversion tunnels, and read the original drawing that shows where engineers drilled beneath the riverbed.

Five-page illustrated PDF · Watch the Hoover Dam film

High-scalers suspended on ropes work high above Black Canyon on the Arizona side.
High-scalers at the Arizona intake tower site, July 28, 1932. National Archives
The 1930 Line D drawing marks exploratory drill holes below Black Canyon and shows the proposed dam crest.
Line D drill-hole profile, December 1, 1930. Bureau of Reclamation

The collector hardcover

In development. Planned with about 87 dedicated photo pages, one archival photograph per page, and original engineering drawings printed large enough to study.

Follow Brutal Endeavors for hardcover updates